<progress id="vwh9r"><track id="vwh9r"></track></progress>

<rp id="vwh9r"><object id="vwh9r"><blockquote id="vwh9r"></blockquote></object></rp>
<span id="vwh9r"><pre id="vwh9r"><sup id="vwh9r"></sup></pre></span>

    <dd id="vwh9r"></dd>
  1. <rp id="vwh9r"></rp>
    TESTING
    Testing points are carried out throughout the whole manufacturing process by both ATE (Automated Testing Equipment) and manual means. This ensures a high first pass yield.
    We have a full range of testing equipment in house, including custom-made test jigs to ensure each process is fully tested, before going to the next process.
    • In-circuit testing.
    • PCBA testing.
    • Burn in chambers.
    • Shield room.
    • Automated Optical Inspection.
     
    棋牌娱乐下载